A roofing crew may work around a chimney or vent without servicing the connected appliance. Define who protects, reconnects, inspects, and clears each system before it returns to use.

Identify every combustion-related roof opening

Before work, ask a qualified person to identify the chimneys, flues, and vents connected to furnaces, boilers, water heaters, fireplaces, stoves, or other fuel-burning equipment. Label them on the roofing photos and proposal instead of grouping every opening under a generic “vents” line.

Record the connected appliance, whether it will operate during the project, and any existing service concern. Do not attempt to trace, disconnect, or test a combustion vent yourself.

  • Roof location and plain-language label
  • Connected appliance or fireplace
  • Roofing, masonry, HVAC, or other trade responsibility
  • Planned operating status during the work

Define the roofing and mechanical boundaries

Ask who will protect each vent or chimney, replace or reuse flashing, address corrosion or loose connections, and perform work that belongs to another trade. If a liner, cap, masonry component, or appliance connection is excluded, state that exclusion and the responsible next step.

The Consumer Product Safety Commission advises professional inspection of heating systems, chimneys, and flues and warns that blockages, corrosion, disconnections, and loose connections can contribute to carbon monoxide hazards. A roof inspection does not automatically cover those mechanical conditions.

Keep vents clear during the project

Put temporary protection and daily shutdown checks into the project plan. CPSC specifically warns that appliance vents and chimneys should not be blocked by tarps or debris during home renovations.

Ask how the crew will communicate if a vent is moved, damaged, found loose, or cannot be restored as expected. Stop using the connected appliance when the responsible qualified professional says the venting path is not ready; do not rely on appearance alone.

  • Tarp and debris controls
  • Daily responsibility for open or protected vents
  • Escalation path for damage or unexpected conditions
  • Qualified trade available for excluded work

Verify the handoff before normal use resumes

At closeout, collect roof-interface photos, the final roofing scope, approved changes, and any chimney, flue, or appliance service record. Ask the responsible qualified professional to confirm the system is ready for use when the project affected its venting path.

CPSC recommends working carbon monoxide alarms on every level and outside sleeping areas, while noting that alarms do not replace proper appliance installation and maintenance. Treat any alarm or suspected carbon monoxide exposure as an immediate safety issue and follow emergency guidance; this project checklist is not a diagnostic test.

Related guides

Sources and review

Question frameworks and project-organization suggestions are Roofing Hound’s editorial recommendations. Source links do not imply endorsement. See our editorial approach.

Prepare for the next call

Compare written proposals and prepare follow-up questions.

Build and print a provider-call checklist, or compare local providers.

We can review your project and look for an independent provider. This free service is manual; availability and response time are not guaranteed.

Request free help ↗