Overhead lines and a home’s service entrance can cross the roof work zone. Record the hazard before bids are final, require the roofing employer to own its safety plan, and coordinate the utility or qualified electrical professional when the work cannot stay clear.
Map lines and the service entrance before the scope is final
From a safe ground-level location, identify overhead lines, the service drop to the building, the service entrance or weatherhead, nearby trees and the roof areas where ladders, long materials, lifts or delivery equipment may move. Put the locations in the pre-work photos and ask each bidder how the work zone affects its plan.
Do not climb, measure clearance yourself, touch a line or assume a covered-looking conductor is safe. ESFI advises treating lines as energized, staying at least 10 feet away and contacting the local electric company before work around a power line.
- Ground-level photos of lines and service entrance
- Roof, access and delivery zones marked
- Local utility contact identified
- No homeowner measurement or handling of conductors
Keep safety responsibility with the roofing employer
Ask the roofer to confirm that its competent people have evaluated electrical hazards and planned the work, equipment, access and training. OSHA identifies service drops as a common source of roofing electrocutions and states that employers must protect workers from electrical hazards through appropriate controls.
A homeowner coordination checklist is not the contractor’s electrical safety plan. Do not direct workers, move lines, supply improvised barriers or accept a verbal promise that a line is harmless.
Define the utility and electrical handoff before work starts
If the planned work cannot maintain the required clearance or affects a mast, weatherhead, attachment, meter equipment or conductor, pause scheduling until the roofer identifies the utility or qualified electrical professional responsible for the next decision. Record who contacts the utility, who owns any permit, shutdown or equipment work, and what approval is required before roofing resumes.
Requirements and ownership boundaries vary by utility and jurisdiction. The roofing proposal should separate roof flashing and weatherproofing from utility-controlled or electrical work instead of treating the whole interface as an ordinary penetration.
- Utility or electrician decision owner
- Permit or shutdown requirement confirmed locally
- Roofing versus electrical scope split in writing
- Restart authorization recorded
Close out both the roof interface and the electrical handoff
Collect photos of the completed roofing interface from the contractor and any required utility, electrical or inspection record. Confirm that temporary access restrictions are removed only by the responsible party and keep the records with the final scope and change orders.
If a line is down or anything is touching it, stay away and call emergency services and the utility. This workflow does not determine electrical clearance, authorize work near energized lines, inspect electrical equipment or certify compliance.
Related guides
Sources and review
- U.S. Occupational Safety and Health Administration: Protecting Roofing Workers — checked 2026-11-06
- Electrical Safety Foundation International: overhead power lines around the home — checked 2026-11-06
Question frameworks and project-organization suggestions are Roofing Hound’s editorial recommendations. Source links do not imply endorsement. See our editorial approach.
Prepare for the next call
Compare written proposals and prepare follow-up questions.
Build and print a provider-call checklist, or compare local providers.
We can review your project and look for an independent provider. This free service is manual; availability and response time are not guaranteed.
Request free help ↗