A rooftop air conditioner or heat pump can put curbs, ducts, lines, wiring and service access inside the roofing work zone. Map each interface, assign qualified responsibility and verify both the roof and equipment handoff.

Inventory the equipment and every roof interface

Before the roof proposal is final, identify any rooftop air conditioner, heat pump, packaged unit, curb, duct, line set, drain, wiring path and service platform in or beside the work area. Photograph the existing interfaces from safe locations and ask the roofer which flashing, membrane and drainage details are included.

Record the equipment model information available from the ground or service records and the person who maintains it. Do not assume that a line item for curb or flashing includes opening, moving or evaluating the HVAC equipment.

  • Equipment and curb locations
  • Roofing interfaces in the written scope
  • HVAC service contact
  • Access and shutdown constraints

Split roofing and HVAC responsibilities in writing

Ask the roofer to define removal, temporary protection, curb or flashing work and final weatherproofing. Ask the qualified HVAC professional to define any equipment isolation, lifting, line or duct work, electrical coordination, startup and performance checks.

EPA directs homeowners to certified technicians for servicing equipment that contains regulated refrigerants, and its Section 608 rules cover service practices and technician certification. A roofing crew should not be treated as the default owner of refrigerant or equipment work unless it is separately qualified and contracted for that task.

Agree on the shutdown, weather and change sequence

Put the order of work, equipment shutdown window, temporary weather protection and restart authority on the project calendar. Identify who decides whether an existing curb, duct transition or support can remain and what happens if concealed damage or incompatible dimensions appear.

Require a stop-and-notify path before anyone changes equipment, refrigerant components, wiring or drainage outside the approved scope. Keep any change order separate enough to show which trade owns the roof interface and which owns the equipment.

  • Shutdown and restart authority
  • Temporary protection owner
  • Concealed-condition decision path
  • Separate roofing and HVAC change records

Close out the roof and equipment as two linked checks

Collect photos of the completed flashing or membrane, drainage path, curb and service clearances before access is removed. Have the HVAC professional document the checks appropriate to the affected equipment after it is reconnected or returned to service.

DOE building-science guidance describes quality HVAC installation as including correct equipment matching, refrigerant charge, airflow and sealed ducts. The exact commissioning steps depend on the system and work performed; this workflow does not diagnose equipment, prescribe refrigerant work or certify roof performance.

Related guides

Sources and review

Question frameworks and project-organization suggestions are Roofing Hound’s editorial recommendations. Source links do not imply endorsement. See our editorial approach.

Prepare for the next call

Compare written proposals and prepare follow-up questions.

Build and print a provider-call checklist, or compare local providers.

We can review your project and look for an independent provider. This free service is manual; availability and response time are not guaranteed.

Request free help ↗